Factory acceptance test (FAT)
Direct definition
Pre-delivery testing at the manufacturer or supplier to evaluate specified equipment functions and build attributes against agreed criteria.
Detailed technical explanation
FAT may challenge control sequences, interlocks, alarms and assembly, but may not reproduce site utilities, actual process loads or operational environment. Appropriately documented FAT results can support qualification with a justified no-repeat rationale.
Practical example
ILLUSTRATIVE — In a hypothetical pharmaceutical facility, a qualification engineer challenges a high-temperature trip under an approved safe simulated fault. This is an educational scenario, not an actual investigation or an approved site protocol.
Why it matters
Finding significant issues before shipment reduces site remediation and schedule risk.
Pharmaceutical applications
Finding significant issues before shipment reduces site remediation and schedule risk.
Common misconception
Passing FAT eliminates the need to evaluate installation and site-specific performance.
Source references — not yet verified
- Source register — European Commission EudraLex Volume 4 Annex 15 — Qualification and Validation (2015)
Source supplied with the draft; version and applicability not verified.
Source register link — unverified applicability - Source register — FDA Process Validation: General Principles and Practices (January 2011)
Source supplied with the draft; version and applicability not verified.
Source register link — unverified applicability - Source register — 21 CFR 211.68 — Automatic, mechanical, and electronic equipment
Source supplied with the draft; version and applicability not verified.
Source register link — unverified applicability
Review and applicability
Scientific review incomplete. No scientific reviewer, approval date or regulatory endorsement is claimed.
Educational information. Apply the relevant jurisdiction, product context and approved site quality system.