Implementation Readiness Gate
Direct definition
A defined check that all prerequisites for putting a change into controlled use have been satisfied.
Detailed technical explanation
Typical conditions include approved assessments, required regulatory clearance, executed qualification or validation, approved specifications and instructions, training, supplier qualification and planned monitoring. Missing prerequisites require resolution or documented escalation, not silent waiver.
Practical example
Before a new filling line is used, the site confirms qualified state, approved controls and required approvals.
Why it matters
A scientifically sound plan still fails if prerequisites are missed at cutover.
Common misconception
Change approval and permission to use the changed system are always the same event.
Reference sections
See SOURCE_REGISTER.tsv; SME confirmation before publication
Source references — not yet verified
- European Commission — EudraLex Volume 4, Annex 15: Qualification and Validation (2015), §11 Change Control
Source supplied with the draft; version and applicability not verified.
Source register link — unverified applicability - ICH — ICH Q12: Technical and Regulatory Considerations for Pharmaceutical Product Lifecycle Management (2019), §§2–6 and Appendix 2
Source supplied with the draft; version and applicability not verified.
Source register link — unverified applicability
Review and applicability
Scientific review incomplete. No scientific reviewer, approval date or regulatory endorsement is claimed.
Educational information. Apply the relevant jurisdiction, product context and approved site quality system.