Risk acceptance
Direct definition
Documented decision to tolerate a risk based on sound evidence, predefined criteria and authority.
Detailed technical explanation
Acceptance is not permission to disregard regulations, unresolved critical hazards or inadequate data. Decisions should be proportional to documented patient and product risks, not solely the administrative category assigned.
Practical example
HYPOTHETICAL — Approve a justified low-risk monitoring interval with ongoing trend review.
Why it matters
Unexamined risk assumptions can result in inadequate controls and avoidable product-quality or patient harm.
Pharmaceutical applications
Pharmaceutical production, quality control, engineering and quality assurance.
Common misconception
A low numerical risk score automatically establishes compliance or acceptable patient risk.
Source references — not yet verified
- Source register — ICH Q9(R1) Quality Risk Management
Source supplied with the draft; version and applicability not verified.
Source register link — unverified applicability - Source register — ICH Q10 Pharmaceutical Quality System
Source supplied with the draft; version and applicability not verified.
Source register link — unverified applicability - Source register — EU GMP Chapter 1 Pharmaceutical Quality System
Source supplied with the draft; version and applicability not verified.
Source register link — unverified applicability
Review and applicability
Scientific review incomplete. No scientific reviewer, approval date or regulatory endorsement is claimed.
Educational information. Apply the relevant jurisdiction, product context and approved site quality system.