What is the first GMP decision when a raw material arrives?
Direct answer
Receive into a controlled, unreleased status and verify delivery identity and condition.
Detailed explanation
Receive into a controlled, unreleased status and verify delivery identity and condition. Compare purchase and supplier details, count containers, inspect damage and document traceable receipt before any use. Document the applicable specification, evidence, material status, quality decision and follow-up. Confirm that any risk-based flexibility is consistent with binding local GMP requirements.
Practical application
HYPOTHETICAL — Apply this control to a documented receipt, test, inventory or deviation record.
Common pitfall
Assuming a passing COA or analytical result overrides unresolved identity, handling, traceability or disposition concerns.
Evidence to review
Compare purchase and supplier details, count containers, inspect damage and document traceable receipt before any use.
Source references — not yet verified
- Source register — 21 CFR 211.80 General requirements
Source supplied with the draft; version and applicability not verified.
Source register link — unverified applicability - Source register — 21 CFR 211.84 Testing and approval or rejection
Source supplied with the draft; version and applicability not verified.
Source register link — unverified applicability - Source register — EU GMP Chapter 5 Production
Source supplied with the draft; version and applicability not verified.
Source register link — unverified applicability - Source register — ICH Q9(R1) Quality Risk Management
Source supplied with the draft; version and applicability not verified.
Source register link — unverified applicability
Review and applicability
Scientific review incomplete. No scientific reviewer, approval date or regulatory endorsement is claimed.
Educational information. Apply the relevant jurisdiction, product context and approved site quality system.