How are preventive maintenance tasks documented?
Direct answer
Approved plans and work orders record who performed what, when, on which equipment and with what result.
Detailed explanation
- direct answer
Approved plans and work orders record who performed what, when, on which equipment and with what result.
- scientific and process reasoning
Capture asset identity, interval, methods, observations, parts, tests, deviations and release authorization; reconcile electronic evidence and equipment-use history as applicable.
- Evidence to review
For this topic, document the affected asset and process function, operating exposure, maintenance/inspection records, failure or alert evidence, validated acceptance criteria, authorized equipment status and any relevant lot-specific quality assessment. In particular: Capture asset identity, interval, methods, observations, parts, tests, deviations and release authorization; reconcile electronic evidence and equipment-use history as applicable.
- illustrative application
ILLUSTRATIVE HYPOTHETICAL CASE — At a pharmaceutical site, a granulator gearbox develops abnormal vibration at the end of a long campaign. Engineers and Quality evaluate the relevant failure mechanism, affected process window, equipment status, verified tests and possible product impact.
- common interpretation error
A calendar checkmark supplies the same evidence as a completed work order.
- Regulatory context
21 CFR 211.67 sets US CGMP requirements for equipment maintenance, written procedures, schedules and records; 21 CFR 211.63 and 211.68 address suitable equipment and relevant control systems. EU GMP Chapters 3 and 4 support equipment and record controls. ICH Q9(R1) provides risk-management principles, including preventive maintenance applications; ICH Q10, EU GMP Annex 15 and FDA process-validation guidance inform lifecycle, change and control considerations. None of these prescribes one universal MTBF, MTTR, PM frequency or predictive-maintenance algorithm.
Source references — not yet verified
- Source register — 21 CFR 211.67 — Equipment cleaning and maintenance
Source supplied with the draft; version and applicability not verified.
Source register link — unverified applicability - Source register — EU GMP Chapter 3 — Premises and Equipment
Source supplied with the draft; version and applicability not verified.
Source register link — unverified applicability - Source register — ICH Q9(R1) — Quality Risk Management
Source supplied with the draft; version and applicability not verified.
Source register link — unverified applicability - Source register — 21 CFR 211.68 — Automatic, mechanical, and electronic equipment
Source supplied with the draft; version and applicability not verified.
Source register link — unverified applicability - Source register — ISO 55000:2024 — Asset management — Vocabulary, overview and principles
Source supplied with the draft; version and applicability not verified.
Source register link — unverified applicability
Review and applicability
Scientific review incomplete. No scientific reviewer, approval date or regulatory endorsement is claimed.
Educational information. Apply the relevant jurisdiction, product context and approved site quality system.