Direct answer

Do not mark the requirement verified; assess whether defensible objective evidence already exists or execute an approved challenge.

Detailed explanation

direct answer

Do not mark the requirement verified; assess whether defensible objective evidence already exists or execute an approved challenge.

scientific and process reasoning

Check the current URS, software baseline, associated risk assessment, preapproved criteria and actual response with a documented QA conclusion.

Evidence to review

Check the current URS, software baseline, associated risk assessment, preapproved criteria and actual response with a documented QA conclusion. The evidence package should identify the responsible quality decision, applicable equipment configuration and approved test or impact-assessment records.

illustrative application

ILLUSTRATIVE — In a hypothetical pharmaceutical facility, a calibration investigation reconstructs product impact after an as-found out-of-tolerance instrument result. This is an educational scenario, not an actual investigation or an approved site protocol.

common interpretation error

Traceability can be closed by writing “tested elsewhere” without an evidence reference.

Regulatory context

EU GMP Annex 15 (2015) describes qualification lifecycle expectations, including requirement definition, design evaluation, IQ/OQ/PQ and requalification. The FDA 2011 Process Validation guidance (nonbinding) places equipment/utility qualification before commercial PPQ, while 21 CFR §§211.63, 211.67 and 211.68 contain binding US CGMP requirements relevant to equipment suitability, maintenance and certain checks. Applicable requirements vary with product, equipment function and jurisdiction; verify current versions and site procedures before use.

Source references — not yet verified

Review and applicability

Scientific review incomplete. No scientific reviewer, approval date or regulatory endorsement is claimed.

Educational information. Apply the relevant jurisdiction, product context and approved site quality system.

Related definitions and questions

User requirements specification (URS)Operational qualification (OQ)Critical instrument calibrationA supplier FAT passed, but at SAT an air-pressure fluctuation causes a reject mechanism to fail. What action is appropriate?A tablet press has a new servo drive with unchanged nominal speed, but different torque response. Is simple calibration enough?

More on this topic

Design qualification (DQ)Factory acceptance test (FAT)Site acceptance test (SAT)Installation qualification (IQ)Performance qualification (PQ) for equipmentQualification master plan

Related resource collections

GuidelinesSOP LibraryResourcesAsk Pharma AI — separate approved-source collection