QA finds that a critical temperature alarm in the URS has no mapped OQ test. How should the RTM be closed?
Direct answer
Do not mark the requirement verified; assess whether defensible objective evidence already exists or execute an approved challenge.
Detailed explanation
- direct answer
Do not mark the requirement verified; assess whether defensible objective evidence already exists or execute an approved challenge.
- scientific and process reasoning
Check the current URS, software baseline, associated risk assessment, preapproved criteria and actual response with a documented QA conclusion.
- Evidence to review
Check the current URS, software baseline, associated risk assessment, preapproved criteria and actual response with a documented QA conclusion. The evidence package should identify the responsible quality decision, applicable equipment configuration and approved test or impact-assessment records.
- illustrative application
ILLUSTRATIVE — In a hypothetical pharmaceutical facility, a calibration investigation reconstructs product impact after an as-found out-of-tolerance instrument result. This is an educational scenario, not an actual investigation or an approved site protocol.
- common interpretation error
Traceability can be closed by writing “tested elsewhere” without an evidence reference.
- Regulatory context
EU GMP Annex 15 (2015) describes qualification lifecycle expectations, including requirement definition, design evaluation, IQ/OQ/PQ and requalification. The FDA 2011 Process Validation guidance (nonbinding) places equipment/utility qualification before commercial PPQ, while 21 CFR §§211.63, 211.67 and 211.68 contain binding US CGMP requirements relevant to equipment suitability, maintenance and certain checks. Applicable requirements vary with product, equipment function and jurisdiction; verify current versions and site procedures before use.
Source references — not yet verified
- Source register — European Commission EudraLex Volume 4 Annex 15 — Qualification and Validation (2015)
Source supplied with the draft; version and applicability not verified.
Source register link — unverified applicability - Source register — FDA Process Validation: General Principles and Practices (January 2011)
Source supplied with the draft; version and applicability not verified.
Source register link — unverified applicability - Source register — 21 CFR 211.68 — Automatic, mechanical, and electronic equipment
Source supplied with the draft; version and applicability not verified.
Source register link — unverified applicability - Source register — European Commission EU GMP Annex 11 — Computerised Systems (2011)
Source supplied with the draft; version and applicability not verified.
Source register link — unverified applicability - Source register — ICH Q9(R1) — Quality Risk Management (2023)
Source supplied with the draft; version and applicability not verified.
Source register link — unverified applicability - Source register — ICH Q10 — Pharmaceutical Quality System (2008)
Source supplied with the draft; version and applicability not verified.
Source register link — unverified applicability - Source register — 21 CFR 211.63 — Equipment design, size, and location
Source supplied with the draft; version and applicability not verified.
Source register link — unverified applicability - Source register — European Commission EU GMP Chapter 3 — Premises and Equipment
Source supplied with the draft; version and applicability not verified.
Source register link — unverified applicability
Review and applicability
Scientific review incomplete. No scientific reviewer, approval date or regulatory endorsement is claimed.
Educational information. Apply the relevant jurisdiction, product context and approved site quality system.